[1]
A. de S. Miranda, L. R. Bergamasco, M. F. de Oliveira Reis, A. S. Almeida, S. L. Francisco, and R. R. Ferraz de Campos, “Integrated Application of Lean Manufacturing Tools for Process Optimization: A Case Study in an Electrical Components Industry”, Atena-FGP, vol. 2, no. 2, pp. 62–76, Sep. 2026, doi: 10.29327/2800502.2.2-4.